Below is a list of lead times for our most common custom services. If you have received a shipment notification, and your order contains any of these items, please make sure that the lead time has passed before inquiring about your order.
*Please note: If you have more than one custom item, those lead times will stack. Meaning if you have Barrel Reaming and Cerakote, the total lead time will be 1 week + another 6-8 weeks total.
*Times do not include carrier transit times.
Service |
Lead Time |
Notes |
Bull Nose Machining
|
~1 Week
|
|
Custom Slide Machining (SS Patterns / CMS / Serrations / Coffin Cuts / Custom Configured Slides)
|
~5 Weeks
|
|
Slide Melt |
~1 Week |
|
Slide Melt w/ Cavity Fill |
~5 Weeks |
|
Slide Melt with customer supplied optic that's not on the list |
~5 Weeks |
|
Drill & Tap Optic Mount |
~1 Week |
|
Barrel Cut/Crown |
~1 Week |
|
Barrel Threading |
~3 Weeks |
|
|
|
|
|
|
|
Barrel Reaming |
1 Week |
Excludes warranty work |
Guide Rod Assembly |
3 Business Days |
|
Sight Installation |
2 Business Days |
|
Frame or Slide Assembly |
2 Business Days |
|
Test Firing |
1 Week |
|
Other Custom Work
(such as installation or customization of customer supplied parts) |
1-2 Weeks |
|
|
|
|
|
|
|
Barrel or Slide Engraving |
1-2 Weeks |
If all graphics are in place ahead of time |
Slide Cover Plates & Plug Engraving (Custom)
|
3 Business Days |
If all graphics are in place ahead of time |
Crown, Compensator, Magazine, Knife, or Frame Laser Engraving
|
1 Week |
If all graphics are in place ahead of time |
Poly80 Serial Number Engraving |
3 Business Days |
|
Timberwolf Grip Engraving |
5 Business Days |
If all graphics are in place ahead of time |
|
|
|
|
|
|
Two Tone Polishing |
|
Same as base coating lead time |
Flash Nitride |
8-10 Weeks |
|
Cerakote |
6-8 Weeks |
|